What is roof pitch?
Roof pitch is expressed as rise over 12 units of horizontal run. For example, 6:12 is a rise of six inches for every 12 horizontal inches. The slope length factor can help estimate distances measured along the sloped roof.
Calculate roof pitch, angles, deck area, board counts and material budget with fast tools for on-site planning.
Enter vertical rise and horizontal run in the same measurement unit, e.g. inches. Pitch displays rise per 12 units of run.
Estimate boards using overall deck dimensions and an assumed 12-foot board length.
Estimate slab volume, cubic yards, ready-mix cost or the equivalent number of 80 lb bags.
A typical 80 lb bag yields approximately 0.6 ft³. Actual yield varies by product. This is a material estimate, not structural or engineering advice.
Direct, bookmarkable pages with their own inputs, explanations and exports.
Roof pitch is expressed as rise over 12 units of horizontal run. For example, 6:12 is a rise of six inches for every 12 horizontal inches. The slope length factor can help estimate distances measured along the sloped roof.
This preliminary budgeting tool uses a simple board-width model and a 12-foot assumed board length. It does not account for support structures, fasteners, complex geometry, grading or municipal building codes. Always verify measurements and obtain professional specifications.
Early measurements are useful for rough budgets, but they are not structural calculations or a substitute for professional plans. Keep units consistent, record assumptions and verify the actual product dimensions.
If the roof rises 6 inches over 12 horizontal inches, enter rise 6 and run 12. The calculator shows a 6:12 pitch, an angle of about 26.6 degrees and a slope factor of about 1.118. This slope factor is useful for rough calculations of roof-plane length from horizontal distance. Real roofs may include hips, valleys, eaves and overhangs not represented by a single pitch.
A rectangular 12 × 16 foot deck has a basic surface area of 192 square feet. Enter the deck dimensions, face width of the proposed boards, your gap and waste allowance, and a per-board price. The estimator assumes boards are 12 feet long and uses a simplified width-based material model. Check the actual board layout, cut lengths and stock availability before ordering; orientation and seams can change the total.
A waste allowance can cover some offcuts, but not every irregular design. The calculator does not include joists, beams, posts, footings, flashing, fasteners, railings, labor or delivery. Mark those items separately rather than interpreting the materials subtotal as a complete construction quote. The exported CSV is a working estimate, not a signed bid or an engineered plan.
Actual work should use measured dimensions, manufacturer installation guidelines and applicable local building permits or codes. Roof work has fall hazards; structural members must be sized for loads by a qualified professional where required. If the project is complex, irregular or safety-critical, have the dimensions and specifications reviewed before construction.
Rise and run must use the same unit. The displayed pitch normalizes the rise to 12 units of horizontal run.
No. It is a simplified rough estimate using 12-foot boards; cut patterns, board direction and framing constraints can change quantities.
No. The CSV contains the basic material assumptions and calculated results, and should be supplemented before it is used as a quote.
Simple tools designed for desktop and mobile.
Understand pitch, degrees and slope length before building an estimate.
Estimate coverage and board costs, with an adjustable waste allowance.
Export the material breakdown to a spreadsheet-friendly CSV file.